A four lane ROB in lieu of level crossing between Km. 261/2-4 and its approach es from Km. 259/4 to 263/0 on NH - 8 Ahmedab ad - V ado dara - Bombay section on BOT b as i s is constructed. The details of the project are as under :
An additional two lane bridge across river Mahi with approaches is constructed between Km. 91/5 to 93/0 on NH - 8, Ahmedabad - Vadodara - Mumbai Section on BOT b as i s is constructed. The details of the project are as under.
An additional two lane bridge across river Narmada near Zadeshwer with approaches is constructed between Km. 192/0 to 198/0 on NH - 8, Ahmedabad - Vadodara - Mumbai Section on BOT b as i s is constructed. The details of the project are as under.
An additional two lane bridge across river Watrak with approaches is constructed between Km. 33/430 to 42/180 on NH - 8, Ahmedabad - Vadodara - Mumbai Section on BOT basis is constructed. The details of the project are as under.
*Declared as National Highway vide GOI notification dated 26/09/2012