Roads and Buildings Department
Goverment of Gujarat
Sitemap | Contact Us | Home
Screen Reader Access icon Skip to main content
Screen Reader Access icon
Decrease text size
Normal text size
Increase text size
Select Defult Theme
Select Negative Theme
  • About US
    • Functions and back ground
    • Vision
    • Achivements & Performance
    • Organisation Structure
    • Organization Hierarchy
  • Projects
    • Institutionally Aided Project
    • Privatization Projects
  • Budget
  • Basic Activities
    • State Highways & Buildings
    • Panchayat Highways
    • National Highways
    • Designs
    • Quality Control
  • Other Activities
    • Parks & Gardens
    • GERI
    • Electrical & Mechanical
    • Architecture
    • Staff Training College
  • Notices & Tenders
  • Dept. Intranet
Privatization

  • GSRDC

  • Ahmedabad - Mehsana Toll Road

  • Vadodara - Halol Toll Road

Ahmedabad - Mehsana Toll Road

1. Background

Ahmedabad Mehsana Toll Road Company Limited (AMTRL) was promoted by Government of Gujarat (GoG) and Infrastructure Leasing & Financial Services (IL&FS), specifically for the purpose of developing and implementing Ahmedabad Mehsana Road Project under Built, Own, Operate and Transfer (BOOT) basis. Annual and Periodic Maintenance (including renewal and overlay) for next 30 years also to be carried out by AMTRL. The construction of Ahmedabad Mehsana Toll Road commenced on 1st May 2000 and the project achieved substantial completion on 20th November 2002. The project was commissioned on February 20, 2003 within budgeted cost of Rs. 300 Crores and 8 months ahead of schedule.

2. Management

AMTRL and VHTRL is now merged in to GTRICL and its Board of directors are comprising of following members

Government of Gujarat Nominees
Mr. S.B.Vasava Secretary, Roads And Building Department
Mr. Ashwani Kumar, IAS Chief Executive Officer, Gujarat Infrastructure Development Board
Mr. K. M. Patel(I/c) Chief Engineer (Policy & Planning)
Mr. A.N.Mistry Officer On Special Duty, R&B Dept, GoG
MAIF nominee
Mr. Abhishek Poddar Non-Executive Director, MAIF
Mr. Deep Gupta Non-Executive Director, MAIF
Mr. Shubhra Bhattacharya Non-Executive Director, MAIF
Mr. Shubra Bhattacharya Non-Executive Director, MAIF
Independent Director
Mr. Ravi Kapoor Independent Director
Mr. Yagnesh Desai Independent Director

3. Project Cost

Landed Cost of the Project: Rs. 342.24 Crores (Ahmedabad-Mehsana Road)
Landed Cost of the Project: Rs. 170.94 Crores (Vadodara- Halol Road)
Total Project Cost : Rs. 1063.35 Crores (Ahmedabad-Mehsana Road) (freezed as on 31/03/2010)
Total Project Cost: Rs. 904.73 Crores (Vadodara- Halol Road) (freezed as on 31/03/2010)

4. Salient Features of the Project

  • Widening & Strengthening of Existing 51.6 km long road from two lanes to four lanes divided carriageway and construction continuous Service Roads on either side.
  • Widening & Strengthening of Existing 11.5 km long two lanes Kadi - Kalol Spur road.
  • Bypass of 2.3 km long at Sertha village on left side of the existing road.
  • 2 Nos. Main Toll Plazas one Ahmedabad side and other Mehsana side at Km 20+000 and Km 65+500 respectively and two intermediate toll plazas at Chhatral and Nandasan respectively.
  • 2 Nos. Road over Bridges (RoB) & 2 Nos. Minor Bridges, 1 No. Road under Bridge (RuB) and 5 Nos. Underpasses of minimum size of 5 m x 3 m and 5 Nos. Cattle Crossings of minimum size 3 m x 2.1 m.
  • Provision of retro-reflective signboards to improve road safety with very good riding quality to enhance user comfort.
  • Toll Rates are based on road user benefits including savings in Vehicle Operating Costs, Fuel and Time.
  • Round-the-clock Highway Patrolling.
  • 24 hours Ambulance services
  • Extensive tree plantation and transplantation of 1500 nos. trees.
  • Provision of roadside arboriculture and landscaping.

5. Other Details

Independent Engineer : FP India Project Management Consultancy Services Private Limited

Independent Auditor : M/s A. F. Ferguson & Co.

Project Engineer : Mr. Srijit Nair

O & M Contractor : M/s Egis Road Operation India Private Limited

Toll Collection Contractor : M/s TBR Infra Pvt. Ltd. from 1st June-2019

6. Toll notification Ahmedabad-Mehsana road

Vadodara - Halol Toll Road

1. Background

Vadodara Halol Toll Road Company Limited (VHTRL) was promoted by Government of Gujarat (GoG) and Infrastructure Leasing & Financial Services (IL&FS) specifically for the purpose of developing and implementing Vadodara Halol Road Project under Built, Own, Operate and Transfer (BOOT) basis. Annual and Periodic Maintenance (including renewal and overlay) for next 30 years also to be carried out by VHTRL. The construction of Vadodara Halol Toll Road commenced on 1st March 1999 and the project achieved substantial completion on 15th September 2000. The Toll Operations commenced on 24th October 2000. The project has been completed within budgeted cost and time.

2. Project Cost

Landed Cost of the Project : Rs. 160.83 Crores
Construction Cost of the Project : Rs. 119 Crores

3. Salient Features of the Project

  • Widening and strengthening of existing 31.7 Km long road from two lanes to four lanes divided carriageway and continuous service roads on either side.
  • Construction of new bypasses at village Jarod, Asoj and Baska.
  • 2 Nos. Main Toll Plazas one Vadodara side and other Halol side at Km 8+970 and Km 39+750 respectively and one intermediate toll plaza at Savli – Vaghodia Junction.
  • 3 major bridges and 3 minor bridges.
  • 7 Nos. Underpasses of size of 5 m x 3 m.
  • Retro-reflective signboards to improve road safety with very good riding quality to enhance user comfort.
  • Embankment Repairs and Turfing to stabilize the slopes.
  • Round-the-clock Highway Patrolling.
  • 24 hours Ambulance services
  • Extensive tree plantation and transplantation of trees
  • Provision of roadside arboriculture and landscaping.
  • Provision of bus-bays, bus-stops, passenger shelters and truck lay-bys along the project road
  • Toll Rates are based on road user benefits including savings in Vehicle Operating Costs, Fuel and Time.
  • Smart Card technology is also used for regular users to facilitate ease of transaction.

4. Other Details - VHRP

Independent Engineer : FP India Project Management Consultancy Services Private Limited
Independent Auditor : M/s A. F. Ferguson & Co.
Project Engineer : Mr. Dhaval Patni
O & M Contractor : M/s Markolines Infra Private Limited
Toll Collection Contractor : M/s Markolines Infra Private Limited

6. Toll notification Vadodara-Halol road

Back

News & Announcements

 
Play Pause Stop

 

કાયદા અઘિકારીની ૧૧ માસની કરાર આઘારીત ભરતી - અધિક્ષક ઇજનેરશ્રીની કચેરી, માર્ગ અને મકાન વર્તુળ ન‌-૨, રાજકોટ

GSWAN Vibrant Gujarat
Home | Message from Chief Minister | About Us | Projects | Budget | Basic Activities | Other Activities | Contractors | Right to Information Act (RTI) | Notices & Tenders | Jilla Seva Sadan
Circuit House | News & Announcements | Media Gallery | Dept. Intranet | Contact Us | Sitemap
© Roads and Buildings Departments. All Rights Reserved.
Back to Top
Valid XHTML 1.0 Transitional Valid CSS!