VISION 2010


FUTURE SCENARIO :

Over all Road Development Plan upto 2010 at a glance :

In accordance with the instructions issued by State Government given by Hon. Chief Minister to prepare the Agenda plan 2010 for Infrastructure development, the Road Development Plan - 2010 is prepared. This proposed Road Development Plan includes road projects proposed to be taken up

  1. from State resources i.e. from State budget
  2. with loan Assistance of National and international lending institutions / Agencies like HUDCO, NABARD, World Bank etc.
  3. with the help of private sector on B.O.T. basis and
  4. other projects with funding arrangement like market Borrowing Road Bonds etc.


The Projects Planned in Vision 2010 are as below :

The Proposed planning is prepared for the periods (1) 1997 to 2002 AD and (2) 2002 to 2010 AD. The brief details are as under:-

Details
Length of New Roads / Improvements of roads Kms.
Estimated Cost Rs. in Crores
(1)
(2)
(3)
(A)
Road projects / works to be taken up from State rsources - Budgetary Provisions
9th Five year plan ( 1997 - 2002 ) for road development
4615
776.00
(B)
Road Projects to be taken up with loan assistance of lending institutions
(1)
Improvement of State Highways project to be taken up with World Bank loan assistance
1734
2132.00
(2)(a)
Project of Improvement of 3 State Highways with loan Assistance of HUDCO / NABARD
389
185.00
(2)(b)
Project of Improvement of Rural / Village Approach roads with Assistance from NABARD
2500
207.00
(C)
Road Projects to be taken up with Private Sector Participation on B.O.T. Basis
(1)
Projects of 4 laning of two State Highways to be taken up with assistance of Infrastructure Leasing & Financial Services New Delhi.
85
470.00
(2)
Road Projects to be taken up by private entrepreneurs / investors on B.O.T. Basis
233
299.00
Total for road development plan up to 2002 AD ( A+B+C)    

 

Details of Roads Development Planning from 1997 to 2002 :

During 9th Five Year Plan ( 1997-2002), importance is given to capacity augmentation of existing road network by widening and strengthening. Also for development of backward areas provision is made for construction and improvement of rural roads. It is planned (i) to construct bypasses around busy cities/towns and (ii) to construct missing links.

 

Sr.
Details
Length / Nos.
Estimated Cost in Rs. Crores
1.
Construction of missing links including missing bridges
114 Kms.
196.50
2.

Widening of roads including widening of bridges. Widening of Intermediate lanes.

Two Lanes

Four Lanes


595 Kms.

365 Kms.

50 Kms.


48.00

75.20

75.00

3.
Improvement of Roads Strengthening / Metal / Asphalt surfacing.
2991 Kms.
314.70
4.
Construction of by passes around towns / cities
16 Nos.
26.60
5.
Improvement of non plan roads
500 Kms.
40.00
Total
4615 Kms.
776.00


Projects to be taken up from State Budget during 2002 to 2010 :

It is planned to take up the works of Construction / improvement of roads of 7484 Kms length at an estimated Cost of Rs. 3200 crores during the period 2002 to 2010.

Sr.
Details
Length / Nos.
Estimated Cost Rs. in Crores
A.
Road projects to be taken up from the State Budget Provision during the period 2002 to 2010.
1.
Construction of missing links including missing bridges.
183 Kms
414.40
2.
Augmentation of road capacity (Widening) including widening of bridges.
-
-
-
Widening to
-
-
-
(1) Intermediate lane
952 Kms.
380.00
-
(2) Two lane
584 Kms.
300.00
-
(3) Four lane
180 Kms.
360.00
3.
Improvement of Roads i.e. Strengthening / providing metal / asphalt surface
4785 Kms.
1303.00
4.
Construction of by passes around cities / towns
25 Nos.
42.60
5.
Improvement of Non plan roads
800 Kms.
400.00
-
Total
7484 Kms.
3200.00

 

TOP